Product Checklist
Prior to agreeing a site inspection, you must confirm you have carried out all of the following checks for the selected product.
- I have read the assembly and installation guide.
- I have watched the installation video on the website.
- I have watched the toe & heeling video on the website.
- I have allowed for the correct fitting tolerances.
- I have used the correct number of fixings.
- I have used the correct number of fixing straps.
- I have positioned the fixings correctly.
- I have used frame packers to prevent frame distortion.
- I have ensured the cill is straight and flat.
- I have fixed the cill correctly.
- I have packed the cill correctly.
- I have fitted the complete end caps to the cill and correctly sealed them.
- I have fitted the outer frame square and plumb.
- I have ensured the head and cill run parallel.
- I have silicone sealed the frame to the cill.
- I have correctly siliconed the frame to the building.
- I have checked that there are no gaps between the sash gasket and the outer frame.
- If a low threshold is fitted, I have confirmed it is not in an exposed location.
- If the door is higher than 2300mm, I have fitted five sets of hinges per sash.
- I have fitted the holding magnets.
- If the doors were supplied flat packed, I have fitted and fully tightened all screws into the door hinges.
- If the doors were supplied flat packed, I have sealed all joints with the cement and silicone.
- I have allowed for the correct fitting tolerances.
- I have used the correct number of fixings.
- I have positioned the fixings correctly.
- I have used the correct number of fixing straps.
- I have used frame packers to prevent frame distortion.
- I have ensured the cill is straight and flat.
- I have fixed the cills correctly.
- I have packed the cill correctly.
- I have fitted the outer frame square and plumb.
- I have ensured the head and cill run parallel.
- I have silicone sealed the frame to the cill.
- I have correctly siliconed the frame to the building.
- I have ensured the locking side of the sliding sash is parallel to the jamb.
- I have adjusted the wheels after the sashes have been glazed.
- If a low threshold is fitted, I have confirmed it is not in an exposed location.
- If the doors were supplied flat packed, I have assembled them correctly.
- If the doors were supplied flat packed, I have sealed the outer frame joins with silicone.
- I have fitted the door stoppers.
- I have allowed for the correct fitting tolerances.
- I have used the correct number of fixings.
- I have positioned the fixings correctly.
- I have used the correct number of fixing straps.
- I have used frame packers to prevent frame distortion.
- I have fixed the cill correctly.
- I have silicone sealed the frame to the cill.
- I have fitted the outer frame square and plumb.
- I have correctly siliconed the frame to the building.
- I have watched the installation video on the website.
- I have watched the adjustment video on the website.
- I have watched the toe & heeling video on the website.
- I have allowed for the correct fitting tolerances.
- I have used the correct number of fixings.
- I have positioned the fixings correctly.
- I have used the correct number of fixing straps.
- I have used frame packers to prevent frame distortion.
- I have fixed the cill correctly.
- I have silicone sealed the frame to the cill.
- I have fitted the outer frame square and plumb.
- I have correctly siliconed the frame to the building.
- I have set up the door hinges correctly.
- I have used the correct hinge packers during fabrication.
- I have checked that the door sash / composite door slab is not bowed.
- I have used the correct couplings between the frames.
- If a low threshold is fitted, I have confirmed it is not in an exposed location.
- I have ensured the homeowner engages the locks when the door is closed.